DAWNSPRINGHainan · International Trade

Product category

Solar PV components, quoted as a system.

Modules are the easy part. The differences that matter are mounting design, inverter compatibility, grid-code compliance and whether test reports cover the exact model you receive.

Modules · Mounting · InvertersGrid code: market-specificTest reports: per supplier

Scope

What this category covers

We quote modules, structure, inverter and balance-of-system together so that electrical and mechanical compatibility is checked before purchase order — not discovered on site.

Every product family below is a sourcing direction, not a fixed catalogue. Availability, model and price are confirmed per inquiry.

Documents and certificates are confirmed per supplier and per order.

Sub-modules

What we can source, by application

Choose a sub-module to see typical use, scope and the information we need to quote.

01

Residential rooftop

Rooftop PV for houses and small buildings.

Typical use

Detached and semi-detached houses, small shops

Typical scope

3–10 kWp rooftop kits with string or hybrid inverter; mounting per roof type.

Send us

  • Roof type and usable area
  • Monthly consumption and target offset
  • Grid connection and metering

Send an inquiry

02

Commercial rooftops

PV for shops, offices, warehouses and car parks.

Typical use

Retail, offices, warehouses, carports

Typical scope

10–100 kWp systems with monitoring and BOS components.

Send us

  • Roof structure and load capacity
  • Consumption profile and tariffs
  • Local grid code and approvals

Send an inquiry

03

Industrial & ground-mount

Factory roofs, ground-mount arrays and carport structures.

Typical use

Factories, ground-mount projects, carports

Typical scope

Project-specific structure engineering, modules and inverters; site survey required.

Send us

  • Site layout and drawings
  • Target capacity and timeline
  • Certification and grid requirements

Send an inquiry

Information we need

Send this to get a useful answer

The more precise the input, the less guesswork in the quotation. If something is unknown, tell us — it becomes an open item, not an assumption.

  • Installed capacity (kWp), module wattage preference and array layout
  • Roof type or ground conditions, tilt and mounting constraints
  • Inverter preference: string, hybrid or micro; single or three phase
  • Destination country and applicable grid code / certification
  • Required module certificates (for example IEC 61215 / 61730 reports)
  • Quantity in pallets or containers; mixed-model orders accepted?
  • Delivery schedule and project milestones
  • Packaging and labelling requirements for the project site
Quotation essentials
IncotermDiscussed per order (EXW / FOB / CIF and others as applicable)
PaymentAgreed in writing before production
ValidityStated on each quotation
InspectionPre-shipment inspection level agreed per order; third-party inspection on request
DocumentsPer product and per supplier — see the compliance page

Prices are not published because they depend on specification, quantity, Incoterm and destination. Please send an inquiry for a written quotation.

Supply channels

Mainstream module and flexible PV channels

Brands we can approach when preparing a quotation. No brand logo is used and no partnership is implied.

Modules & systems

Commonly available brands for quotation:

  • JinkoSolar 晶科
  • GCL 协鑫
  • Trina 天合
  • Chint 正泰
  • Canadian Solar 阿特斯
  • Tongwei 通威

Flexible PV

Flexible and lightweight modules, subject to supplier availability:

  • Sunyue 尚越光电
  • Sunman 上迈新能源
  • Xingsheng 兴晟光伏

Brands and models are confirmed by the actual quotation. This page does not constitute any agency, authorisation or partnership statement.

Inquiry

Send your requirement

Product, quantity, destination and documents. We reply with a written scope within 24 hours on business days.

Read the Privacy Policy before submitting.

Or e-mail us

Have a specification or a target price to check?

Send it with quantity and destination. We will reply with what can be confirmed, what must be verified, and the documents we need from the supplier.